Descargar Imprimir esta página

cecotec MOUNTAIN MILLOR Manual De Instrucciones página 39

Bicicleta eléctrica

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
ENGLISH
1. PARTS AND COMPONENTS
Fig. 1
1.
Aluminium alloy frame
2.
Rim: spoked rims
3.
Wheels
Brakes: disc brake
4.
5.
Removable 36 V 12.8 Ah battery
6.
Motor
7.
Shimano 9-speed derailleur
LED headlight
8.
NOTE:
The graphics in this manual are schematic representations and may not exactly match the
device.
2. BEFORE USE
-
This electric bike features packaging designed to protect it during transport. Remove the
electric bicycle from its box and remove all packing material. You can keep the original
box and other packaging elements in a safe place. This will help you prevent damage to
the device when transporting it in the future. In case the original packaging is disposed of,
make sure all packaging materials are recycled accordingly.
-
Make sure all parts and components are included and in good conditions. If there is any
piece missing or not in good condition, immediately contact the official Cecotec Technical
Support Service.
Box content
E-Bike
-
-
Charger
-
Tools
-
Instruction manual
76
MOUNTAIN MILLOR
3. ASSEMBLY
Step 1
Place the appliance upright. You can identify the vertical position of the box by checking the
"this side up" sign on the side of the box with directional arrows. Open the box carefully with
the help of a box cutter or scissors.
Step 2
The e-bike is packaged to prevent scratches and damage. Once the box has been opened,
carefully remove the parts. To do this, hold the electric bike by the stem and top tube and lift
it vertically. Place it carefully on the floor, away from the packaging and in an upright position
Step 3
Apart from the main body of the electric bike, the box contains smaller boxes containing other
components such as the charger, pedals, and tool kit. Remove them with care.
Step 4
The front wheel comes packaged with the electric bike and is attached to the frame with the
help of a zip tie. The packaging protects the mechanical brake and the tyres from damage. To
remove the front wheel from the frame, carefully cut off the zip tie and store it. Next, be sure
to remove the protective packaging from the wheel before you start installing it on the electric
bike.
Step 5
Look for any zip ties that may still be left on the wheel. Cut them carefully without damaging
the electric bicycle.
Step 6
Keep the electric bike in an upright position and remove all packaging. Then you can start
assembling the product.
Assembling the handlebar. Fig. 2
The E-bike is delivered with the stem bracket facing away from you. Before mounting the
handlebars, make sure that the stem bracket faces outwards.
1.
First stand at the front of the bike and then loosen the two screws at the handlebar
bracket joint with the 5 mm Allen key
2.
Then carefully turn the stem cover outwards. You must turn the stem cover 180°
counterclockwise and align it correctly.
3.
Remove the four screws of the upper bracket with the 4 mm Allen key and remove the
stem cover.
4.
Carefully place the handlebars in the now open stem cover. Ensure that all cables are
ENGLISH
77
MOUNTAIN MILLOR

Publicidad

loading

Este manual también es adecuado para:

07219