Assembly
D
26
Loosen the adjusting knob
wards (see Fig. E).
E
27
Turn the pressing roller unit
Fig. F).
F
28
Loosen the feed roller holder
counterclockwise and remove it by pulling it
upwards (see Fig. G).
Check the top of the feed roller
appropriate wire thickness is set. If necessary,
the feed roller must be turned around or replaced.
The welding wire supplied (Ø 0.9 mm) must be
38 GB/IE
18
and pivot it up-
27
to the side (see
28
by turning it
30
to see if the
29
used in the feed roller
wire thickness diameter of Ø 0.9 mm.
The wire must be in the upper notch!
Reattach the feed roller holder
tightly.
G
29
30
Remove the burner nozzle
clockwise (see Fig. H).
Unscrew the welding nozzle
Lead the cable assembly
welding unit in as straight a line as possible
(place it on the floor).
H
7
14
Remove the wire end from the coil edge (see
Fig. I).
Shorten the wire end using a wire cutter or side
cutter to remove the damaged/ bent wire (see
Fig. I).
Note: The wire must be kept taut the entire
time to prevent it from loosening and unrolling!
with the next highest
29
and screw it
30
by rotating it
7
(see Fig. H).
14
away from the
13