Operation; Run-In Period - ProMinent CLE 3-mA Instrucciones De Servicio

Célula de medición de cloro para cloro libre
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Electrical installation
DMT-Variant
Plug in the 5 pin plug.
IMPORTANT
The DMT variant must be connected only to the DULCOMETER
chlorine device.
Plan of terminal connections for DMT: see chapter 16.
4-P-Variant
Plug in the 4 pin plug.
IMPORTANT
The 4-P variant must be connected only to the DULCOMETER
device.
7
IMPORTANT
• The sensor must not be operated in water or solutions containing
• Do not switch off the measuring system during interval operation!
7.1
To acquire a stable display value the sensor should be run in for a
predetermined period.
When first commissioned:
When re-commissioned:
When membrane/electrolyte replaced:
ProMinent
®
Rotate the sensor adapter a quarter-turn anticlockwise and pull off
(bayonet fitting).
Unscrew the locking screw of the PG 7 threaded connector and feed
through the signal cable from the controller.
Strip the cable ends and connect to the 2-wire connector: 1 = plus,
2 = minus.
Insert approx. 5 mm of the signal cable into the sensor and tighten the
PG 7 threaded connector locking screw.
Push the sensor adapter right into the housing and rotate carefully
clockwise until the stop. Take care not to break the tips of the bayonet
fitting.

Operation

surfactants.
After any operation without chlorine, running-in periods are to be
reckoned with. If required, switch on metering unit time-delayed!
If no chlorine is metered for a longer period of time, the sensor must
be disconnected from the mains and stored in a dry condition.

Run-in period

Installation / Operation
1 - 3 h
0.5 - 2 h
approx. 0.5 h
®
DMT
®
CLD
27

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cle 3-dmtCle 2.2-4p

Tabla de contenido