5olAT ASSEMBLY
STEP 1
I
HARDWARE
FOR STEP 1 :
1
BOLT (A)
20 mm
Qty: 6
SPRING
WASHER
(B)
8.2 mm
Qty: 6
ARC WASHER
(C)
8.2 mm
Qty: 6
Qty:SCREW(D)I
2 mm8
__
Qty:20SCREW(L)mm2
SCREWS
(D)
SCREWS
(L) _
MAIN
FRAME
BOOT
_
MAIN
FRAME
* This step is for 5.1AT models only. For 3.1AT models,
proceed to page 12.
B
C
Cut the yellow banding
straps and lift the running
deck upward to remove all contents
from underneath
the running
deck.
Open HARDWARE FOR STEP 1.
Place MAIN FRAME BOOTS over MAIN FRAME as
shown.
D
Attach MAIN FRAME BOOTS to MAIN FRAME
using 8 SCREWS (D) from above and 2 SCREWS
(L) from the front.