Installation And Final Acceptance Protocol 1 - SKYLOTEC D-BOLT AP-058 Instrucciones De Uso

Ocultar thumbs Ver también para D-BOLT AP-058:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 83
10.
INSTALLATION AND FINAL ACCEPTANCE PROTOCOL FOR
ANCHOR POINTS
(part 1, remains with the operator)
Building / site
Address:
Remarks:
Client
Name:
Address:
Assembler
Name:
Address:
Anchor device
Manufacturer:
Model / Type:
Serial numbers:
Building section
Component 1:
Component 2:
Building material:
Mountings / anchors
Mounting data:
Actual situation:
Remarks:
Drilling method:
Test equipment:
MAT-MA-0005-00-GB
Drill Ø:
Drill depth:
Tightening torque:
Edge distance:
Cx:
Centre distance Sx:
¨
Rotary hammer
¨
Diamond drill
¨
Torque wrench
D-BOLT
Order No.:
Building type:
Roof type:
Anchor device:
Contact person:
Phone:
Chief assembler:
Phone:
Minimum component thickness:
Minimum component thickness:
Quality:
mm
Type:
mm
Material:
Nm
Minimum edge distance (c):
Minimum centre distance (s):
Minimum component thickness:
Permissible traction load:
Permissible lateral force:
Cy:
Sy:
Drill holes cleaned
Hammer drill
System
Anchor tester
20.07.2018
¨
¨
yes
no
¨
¨
yes
no
¨
¨
wet
dry
¨
¨
yes
no
Page 15 of 19

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ap-063-geAp-063-gps

Tabla de contenido