4.8
Test boiler
The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 4).
If the burner must be combined with a boiler that has not been EC
approved and/or its combustion chamber dimensions are clearly
smaller than those indicated in the diagram (Fig. 4), consult the
manufacturer.
Technical description of the burner
11
GB
The firing rates were obtained in special test boilers, according to
EN 676 regulations.
In Fig. 4 you can see the diameter and length of the test combus-
tion chamber.
Example:
Output 400 kW - diameter 50 cm - length 1.45 m.
D497
Fig. 4
20040563