Descargar Imprimir esta página

dirna Bergstrom bycool green line COMPACT ADR Instrucciones De Montaje página 28

Publicidad

Idiomas disponibles

Idiomas disponibles

COMPACT
EN
Fasten supports tightening nuts until
14
outside EPDM joint (Point 4) of equipment
is compressed, between 3 and 6 mm;
Important: To avoid water from filtering
inside cabin, check EPDM joint tightening
with Compact base, as indicated on
diagram.
3-6mm.
Cabin roof
Fasten selflocked nut until
EPDM gasket is compressed
between 3 and 6 mm.
14
Tighten (4) M8 nuts to support and (4) to
15
Unit base.
EPDM gasket
10 mm*
(*) (approx. after tightening)
Base
Support
28
Air conditioning for vehicles
Check compression
thickness using a
tape measure in the
four corners.
EPDM gasket
14
15

Publicidad

loading