SMA SUNNY BOY STORAGE Serie Instrucciones De Instalación página 62

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9 Decommissioning the Inverter
9. Seal all enclosure openings with sealing plugs.
10. Lead the enclosure lid to the Connection Unit and plug the ribbon cable into the socket on the
communication assembly.
11. Ensure that the ribbon cable is securely plugged into the sockets at both ends.
12. Position the enclosure lid of the Connection Unit on the enclosure and tighten all 6 screws
crosswise with a Torx screwdriver (TX 25) (torque: 3 Nm ± 0.3 Nm (26.55 in-lb ± 2.65 in-lb)).
13. If the inverter is secured against theft with a padlock, open the padlock and remove it from the
inverter.
14. Using a Torx screwdriver (TX 25), unscrew the
screw M5x60 which fastens the inverter to the wall
mounting bracket.
15. Remove the inverter by lifting it vertically up and off
the wall mounting bracket.
16. Unscrew the screws for fastening the wall mounting bracket and remove the wall mounting
bracket.
17. If the inverter is to be stored or shipped, pack the inverter and the wall mounting bracket. Use
the original packaging or packaging that is suitable for the weight and dimensions of the
inverter and secure the packaging with tension belts, if necessary.
18. Dispose of the inverter in accordance with the locally applicable disposal regulations for
electronic waste.
62
SBSxx-US-10-IA-xx-11
SMA Solar Technology America LLC
Installation Manual
T O P

Publicidad

Tabla de contenido
loading

Tabla de contenido