Assembly Instructions; How To Use - SKF LAGM 1000E Instrucciones De Uso

Ocultar thumbs Ver también para LAGM 1000E:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31

5. Assembly instructions

Replace the lubrication pipe or high-pressure hose on your grease pump or grease gun
with the grease meter assembly. If wanted the extension pipe with nozzle can be replaced
by the extension hose (1077601).

6. How to use

Mobile installation with a grease gun or pump
There are two ways to start the Grease Meter. Either use it (pump grease through it) or
press the
button to conitnue with the previous measurement:
The display lights up:
To reset the Grease Meter after each dispensing press the
button.
(The RESET text shows that in this menu the left button has the reset function.)
An alternative way to reset the meter is to wait untill the auto shut off time
(see chapter 6.5) has elapsed and restart the meter by pumping grease though it.
To light up the display when working in dark environments press the
button.
The light will automatically switch off 5 seconds after the grease flow has stopped.
The battery symbol indicates how much power is left in the batteries.
Permanent installation (in conjunction with an automatic lubrication systems)
Activate this mode by setting the auto shut off time to "stby" (see chapter 6.5).
In this mode the display don't activate when it detects grease flow.
The Grease Meter measures the amount passing through it.
Use the
button to turn the display on or off (>2 seconds to turn it off).
When this mode is active there is a "STBY"
in the lower right corner on the display.
SKF LAGM 1000E
5

Publicidad

Tabla de contenido
loading

Tabla de contenido