Installing The Battery - Westinghouse PRO Serie Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY
6.
Install the lifting bracket using the hex bolts,
spacers and locknuts
1
2
3
4
Figure 8 – Installing Lifting Bracket
1 - Lifting Bracket
2 - Hex Bolt
16
(see Figure 8).
3 - Spacer Sleeve
4 - Locknut

INSTALLING THE BATTERY

WARNING
To avoid electric shock:
• ALWAYS connect the positive (+)
battery cable (red boot) first when
connecting battery cables.
• ALWAYS disconnect the negative (-)
battery cable (black boot) first when
disconnecting battery cables.
• NEVER connect the negative (-)
battery cable (black boot) to the
positive (+) post on the battery.
• NEVER connect the positive (+)
battery cable (red boot) to the
negative (-) post on the battery.
• NEVER touch both battery posts
simultaneously.
• NEVER place a metal tool across
both battery posts.
• ALWAYS use insulated or non-
conducting tools when installing the
battery.
N
OTE:
The generator comes equipped with the
positive battery cable (red boot) already
attached.
1. Verify the positive (+) battery cable (red boot) is
securely tightened to the positive (+) battery post.
Make sure boot is over battery post.
2. Carefully remove the protective wrapping around
the lug of the negative (-) battery cable (black boot).
3. Locate negative (-) cable attached to alternator
cable, remove tie and route to the negative (-)
battery post.

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

10kpro8kpro210051210075

Tabla de contenido