Setting the Program Watering Day Schedule
Watering days can be scheduled for each Program using one of the following methods:
Weekdays
Schedules watering for specific days of the week.
Skip Day
Schedules watering days by interval frequency ; e.g., every day (01), every-
other-day (02) etc. Skip Days is addressed in the online User Manual.
Odd/Even Date Schedules watering days based on Odd- or Even- numbered calender days.
Odd/Even Date is addressed in the online User Manual.
To set a Weekdays Schedule:
Function switch to Set
1.
Programs.
2.
Select Program
A, B, or C.
3.
Turn Dial to desired
Weekday.
4.
turns day
turns day
Manual Operations
Semi-Automatic Program Operation
Semi-Automatic Program operation enables an automatic Program watering cycle to be started
manually at any time. Once running, the manual advance feature enables you to step through
the programmed station sequence.
1.
Place the Function
switch in the Run
position.
2.
Turn the Dial to the
Current Time position.
Note: Once started, the station sequence can be manually advanced by placing the Dial
to Current Time and pressing the Manual button.
10
5. Repeat steps 3 and 4 to turn On and
Off days as needed.
Switch to a different Program. Repeat
steps 3 and 4 as needed.
6.
Return Dial to
Current Time.
7.
Function switch back
to Run.
3.
Select Program
A, B, or C.
4.
Press the Semi-Auto
button to start the
watering cycle.