Reception Of The Machine; Unpacking - OEM PF 33 MT Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 111
PF 33 MT - PF 46 MT
Transport and unpacking

2.3 - RECEPTION OF THE MACHINE

Upon reception of the machine make sure that the pack-
ing is complete and not damaged. Should the packing
be complete, remove it as specify at point 2.4 (unless
otherwise instructed by the manufacturer).
Check if the instruction booklet is inside the packing
as well as the components specified in the transport
documentation.
In case any damage or defect is found:
a- Inform immediately the transport company and your
agent, both by phone and by registered letter with
return receipt;
b- Inform the manufacturer as mentioned above, ad-
dressing the correspondence to:
OEM ALI Group S.r.l. a Socio Unico
Viale Lombardia, 33
46012 BOZZOLO (MN) Italia
Tel.: +39 0376 - 910511 - Fax: +39 0376 - 920754
2.4 - UNPACKING (Fig. 3)
To remove the packing from the machine proceed as
follows:
Cut the straps (1) that tie up the carton.
Open the carton (2), by removing the metallic clips.
Remove the cardboard packaging (2).
Check if everything is complete.
Check if the delivery is complying with the PACKING
LIST.
ATTENTION
All packing materials should be collected and sent to
the special recovery centres for a correct recycling.
Any damage or defect or non conformity with the
packing list should be immediately reported and, in
any case, it should be notified within 8 days from the
date of reception of the machine. On the contrary the
goods are to be considered as accepted.
IMPORTANT
FIG. 3
2
1
1
EN - 7

Publicidad

Tabla de contenido
loading

Productos relacionados para OEM PF 33 MT

Este manual también es adecuado para:

Pf 35 mtPf 46 mt

Tabla de contenido