Programming For The Control Unit Xr60Cx; Programming Checklist; Notes On Parameters In The Display; Check Or Change The Set Parameters In The First Level - Dometic FRIGO 8883000002 Instrucciones De Montaje

Juego de montaje del evaporador
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 108

Programming for the control unit XR60CX

10
Programming for the control unit XR60CX
I
NOTE
Before starting the Frigo cooling system for the first time, the parameter values
in the control unit must be programmed. Enter the setting values in the param-
eter list below for this purpose.
Check the values taking into account the equipment.
If there are any deviations, correct these in the control unit!
10.1

Programming checklist

➤ Select refrigerated truck version, check parameters and, if necessary, correct.
z Deep freezing with hot gas defrosting
z Chilled goods with loading area temperature control:
10.2

Notes on parameters in the display

I
NOTE
The operating unit has an internal operating hours counter. This is the basis for
the maintenance due shown in the display. Initial maintenance should be car-
ried out 100 operating hours after start-up. All other maintenance should be
carried out after every 1000 hours of operation.
10.3

Check or change the set parameters in the first level

I
NOTE
At the "Pr 1" level only some available parameters are visible.
➤ To call up the first parameter level press and hold the SET button and the
at least 3 seconds. The LED "C" flashes. The description of the first parameter "LS" is
shown on the lower line in the display and the value set on the upper line.
➤ To select the respective parameters use the
➤ Briefly press SET to change the value of each parameter.
Top display: Value of parameters set
Bottom display: Parameter description
or
buttons.
Frigo
button for
27

Publicidad

Tabla de contenido
loading

Tabla de contenido