dirna Bergstrom bycool COMPACT 3.0 Instrucciones De Montaje página 27

Ocultar thumbs Ver también para bycool COMPACT 3.0:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

COMPACT
Position (1) Ø8 flat wide-rimmed washer and
8
(1) self-locking M8/125 nut and tighten until
the EPDM seal is compressed between 3 and
6 mm, then tighten the nut above the roof of
the cabin against it.
Check the sealtight integrity of the EPDM
seal between the base of the unit and the
cabin roof.
If necessary, reinforce the cabin roof by
positioning a support piece attached to
the bottom of the roof and securing it with
the Ø8 washers and M8/125 self-locking
nuts.
Position foam rubber, ensuring the softest part
9
is placed on the base of the unit.
Caution: Depending on the cabin, it may
be necessary to use the (2) supplied ducts
in order for the air distribution panel to be
completely adjusted.
8
Reinforcement piece
ALL MODELS
9
27
ES
EN
®

Publicidad

Tabla de contenido
loading

Tabla de contenido