Shut-Down - Rothenberger ROWELD P63 S-6 thermostatic Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
Assembly:
Remove the tube and the accessory from the adapters.
Without rotating them, introduce the tube into the accessory until
the weld-length mark is reached. This operation should be carried
out as quickly and carefully as possible, within the time (MAX AS-
SEMBLY TIME) shown in Table 2.
Setting:
Hold the two parts together during the time indicated under SET-
TING TIME in Table 2.
NOTE: Ensure that the region of the weld is not subjected to any force during this time.
Cooling:
Allow the tube to cool for the time recommended in Table 2 (COOL-
ING TIME).
After the cooling time has finished, the welded tubes and accessories can be used as recom-
mended by the tube manufacturer.
Tube
Diameter
Wall thickness
(mm)
(mm)
16
2,0
20
2,5
25
2,7
32
3,0
40
3,7
50
4,6
63
3,6
75
4,3
90
5,1
110
6,3
Table 2 Process times for welding PP tubing
3.2.4

Shut-down

When the equipment is no longer going to be used, you are recommended to turn it off and allow
it to cool in order to store it.
Store it carefully in a locked, dry place out of reach of children.
If the socket welding device is packed into its storage case while it is still hot, take
care to place it in the correct position. Incorrect storage could damage the equip-
ment and the storage case.
Heating time
Max assembly
time
(sec)
(sec)
5
5
7
8
12
18
24
30
40
50
ENGLISH
Setting time
(sec)
4
5
4
5
4
7
6
8
6
12
6
18
8
24
8
30
8
40
10
50
Cooling
time
(min)
2
2
2
4
4
4
6
6
6
8
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Roweld p63 s-6 electronic

Tabla de contenido