Covering Installation - EdilKamin DAISY Instalación Uso Y Mantenimiento

Salamandra a água pellets ventilada
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 86
g. 1
C
A
D
g. 2
E
M
g. 3

COVERING INSTALLATION

B
X
M
M
M
V
Fig. 1
The stove is delivered (Fig. 1) with the metal sides (A-B) and
the metal brackets (C-D) for fastening the horizontal ceramic
elements already mounted.
The pieces indicated below are packaged separately.
• 1 upper horizontal ceramic element (F - Fig. 3)
• 1 lower horizontal ceramic element (G - Fig. 7)
• 12 milled pins M4
• 24 washers
To t proceed as follows:
Fig. 2
Open the pellet cover and loosen the screw (X) inside.
Fig. 3
Remove the top (E) complete with the pellet loading cover and
the air grill.
Slide off the two metal sides (M) by loosening the two milled
screws (V) on the rear of the stove.
- 44
-

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido