EdilKamin DAISY Instalación Uso Y Mantenimiento página 46

Salamandra a água pellets ventilada
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 86
COVERING INSTALLATION
C
g. 7
Fig. 7
Fit the horizontal ceramic elements (F, G) onto the structure,
F
complete with the metallic brackets (C, D).
Replace the metal sides (M) and the top (E) previously removed
E
from the stove.
M
G
D
g. 8
Fig. 8
The gure shows the stove completely assembled.
g. 9
R
Fig. 9
Fix the stove to the wall using the square pieces (S) and bra-
ckets (R) provided, or use alternative systems that ensure its
stability.
S
- 46
-

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido