Attaching The Lid Handle; Placing The Cooking Components - Pit Boss PBK24 Instrucciones De Montaje

Ocultar thumbs Ver también para PBK24:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27

7. ATTACHING THE LID HANDLE

Parts Required:
1
x
Lid Handle (#5)
Installation:
Attach the lid handle to the ceramic body use the pre-attached screws
washers, locking washers, and nuts on the trim.

8. PLACING THE COOKING COMPONENTS

Parts Required:
1
x
Upper Cooking Grid (#2)
1
x
Main Cooking Grid (#1)
Heat Deflector (#9)
1
x
Charcoal Plate (#10)
1
x
1
x
Firebox (#11)
Installation:
Open the lid of the ceramic body and insert the firebox into the base
of the ceramic body. The front of the firebox with the arch of the
bottom rim should face the front of the unit, aligning with the bottom
damper for ash clean out. Note 8A.
NOTE: The expansion joint in the firebox is created to account for
expansion of the ceramic in extreme heat. This crack is not a fault in
the ceramic, but intentional in the structure design.
Place the charcoal plate to rest on the interior base of the firebox.
IMPORTANT: The charcoal plate must be in the firebox while in use.
Missing this part could result in lighting failure due to lack of oxygen to
the charcoal once lit.
Place the heat deflector to rest inside the firebox.
NOTE: The heat deflector can be used for indirect cooking.
Place the main cooking grid inside of the ceramic body. Place the
upper cooking grid on top of the main cooking grid.
NOTE: To maintain the grilling performance of your cooking grids,
regular care and maintenance is required.
The ceramic charcoal barbecue is now ready to use. Note 8B.
IMPORTANT: Ensure that unit curing instructions are read thoroughly
prior to use.
8
7
5
8A
1
10
比例 1.000
8B
2
9
11

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

106521060310604

Tabla de contenido