ROUTINE MAINTENANCE
THE IMAGES ARE FOR ILLUSTRATIVE PURPOSES ONLY.
D
C
E
A
Fumes motor (disassembly and cleaning and fumes pipe and "T"), new silicone in the provided points
B
Seals, pallet hopper, inspections, ash drawer and door (replace and apply silicone where required)
C
Combustion chamber & exchanger (total cleaning) including cleaning the glow plug duct
D
Hopper (empty out completely and clean) and check seal.
E
Check air intake pipe and check/clean mechanical pressure switch
F
Room air fan disassembly and removal of dust and pellet debris.
66
B
ENGLISH
B
F
A