INSTALLATION INSERTO 700 AIR
ASSEMBLY MUST BE CARRIED OUT BY QUALIFIED PERSONNEL!
GENERAL
MINIMUM CLEARANCE
gure 1
With front loading kit H=625mm
The insert is supplied with a sliding base in iron that allows it to be
installed in a pre-existing chimney.
This sliding base allows the insert to be removed easily to load the
pellets inside the hopper and for any maintenance or cleaning at the
end of the season.
If there is no pre-existing chimney, one can be built using an insert-
holder pedestal (optional kit). In fact, the latter xes the insert to the
ground.
ASSEMBLY: place the base in the chosen point and adjust the feet to
the desired height. Install a socket on the rear of the pedestal in a way
that the plug is accessible once installation has been performed. Fix
the pedestal to the oor using have-duty steel plugs with diameter
of 8mm. Take the sliding base and x it to the pedestal.
Please note: If our pedestal is used, a slot must be created in the ue
pipe to allow the pellet hopper level to be checked, thus avoiding
spillage when it is being topped up.
20
For the insert to operate correctly, a minimum side and rear space
must be guaranteed, as shown in gure 2; the coatings must be
made of non- ammable material.
ENGLISH
20
660
700
gure 2
47