Thermador PROFESSIONAL SERIE Manual De Instalación Y Manteniemiento página 11

Ocultar thumbs Ver también para PROFESSIONAL SERIE:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

11. Remove circular knockouts.
12. Remove junction box channel covering the wires (see
Figure 16 and Figure 17).
13. Before hanging hood, install transition per Figure 10 or
Figure 11. Fasten transition with (2) screws (3/8" sheet
metal, supplied) and aluminum tape per all applicable
codes.
Note:
Screws must not hinder damper operation.
14. Using two people to lift, rest the hood on the screws in
the wood bracket. Use the keyholes labeled "I" in
Figure 12. Make sure the wood bracket fits into the
recess on the back of the hood.
I
Figure 12: Location of Screw Keyholes
15. Tighten the screws in keyholes. Check hood levelness
and adjust if necessary.
16. From inside the hood, drive 5/8" (16mm) screws
through holes in hood into wooden bracket. See holes
labeled "J" in Figure 12.
17. Connect additional ducting.
J
Assembly & Installation Duct
Covers
(optional)
Optional duct covers shown in Figure 13 may be used to fill
the space between the hood and ceiling in wall mount
installations. 6" (152mm) and 12" (305mm) high duct
covers are available and may be ordered separately (see
"Parts Not Included" on page 4.)
3/8" (9.52mm)
(quantity
dependent on
screw size)
L
I
Figure 13: Attachment of Duct Cover(s) to Hood
1. If multiple duct covers are used, connect the pieces
together using sheet metal screws provided with the
duct cover accessories.
2. Attach the duct cover(s) to the hood using sheet metal
screws as shown in Figure 13.
3. From inside of hood, insert 5/8" (16mm) screws
supplied through holes labeled "L," (1) on each side
and (4) along the front, into bottom of the cover.
L
L
English 9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ph30hsPh36hsPh48hsPh36gsPh42gsPh48gs ... Mostrar todo

Tabla de contenido