Process Cautions - Siemens Pointek CLS 100 Manual De Inicio Rápido

Ocultar thumbs Ver también para Pointek CLS 100:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 59
Mounting
Location
Notes
Installation shall only be performed by qualified personnel and in accordance with local
governing regulations.
This product is susceptible to electrostatic shock. Follow proper grounding procedures.
When using multiple units, sensors must be 100 mm apart. Mount diagonally if vertical
space is restricted.
The Pointek CLS 100 is normally mounted into the vessel top (high detection alarm) or
through the tank wall at the detection level (high or low detection alarm).
Vertical
Installation Features and Restrictions
Note:
Mounting diagrams apply to all plastic all versions.
Standpipes
< 50 mm (2")

Process Cautions

Keep out of path of falling material.
Consider material surface configuration when installing unit.
Protect probe from falling material.
Avoid areas where material buildup occurs.
7ML19985QJ81
Angle
> 100 mm (4") min
Pointek CLS 100 – QUICK START MANUAL
Horizontal
Wall Restriction
50 mm
(2")
min
50 mm (2") min
Page EN-5

Publicidad

Tabla de contenido
loading

Tabla de contenido