Process Cautions; Mounting Instructions - Siemens Pointek CLS300 Puesta En Marcha

Ocultar thumbs Ver también para Pointek CLS300:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82
Pointek CLS300 (standard probe length): top or side mounting
High level alarm
• normally mounted into the vessel top, or through the vessel wall at the detection level
Low level alarm
• normally mounted through the vessel wall at the detection level
Pointek CLS300 cable configuration: top mounting
Pointek CLS300 cable configuration is designed for top mounting, for high or low level alarm.
Suspend the cable vertically so that it reaches into the process at the desired detection level.

Process Cautions

• The maximum allowable torque on a horizontally installed rod is 15 Nm.
• Keep unit out of path of falling material, or protect probe from falling material.
• Take into account material surface configuration when installing unit.
• Ensure tensile load does not exceed probe or vessel ratings.

Mounting Instructions

Pointek CLS300 is available in two thread types: NPT, or BSPT. Make sure the mounting
connection threads are of the same type, then simply screw Pointek CLS300 into the process
connection, and hand tighten.
Maintenance
Pointek CLS300 requires no maintenance or cleaning.
Unit Repair and Excluded Liability
For detailed information, please see the inside back cover.
Page EN-4
Pointek CLS300 (analog/digital) – QUICK START MANUAL
detection level
normal process
level
Buildup of material in active shield area does
Note:
not affect switch operation.
normal process
level
detection level
50 mm
(2") min
7ML19985QF81

Publicidad

Tabla de contenido
loading

Tabla de contenido