Process Cautions - Siemens POINTEK CLS100 Instrucciones De Operación

Ocultar thumbs Ver también para POINTEK CLS100:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
Mounting
Location
Note:
Installation shall only be performed by qualified personnel and in accordance with local
governing regulations.
This product is susceptible to electrostatic shock. Follow proper grounding procedures.
When using multiple units, sensors must be 100 mm apart. Mount diagonally if vertical
space is restricted.
Pointek CLS100 is normally mounted into the vessel top (high detection alarm) or through
the tank wall at the detection level (high or low detection alarm).
Vertical
Installation Features and Restrictions
Mounting diagrams apply to all versions.
Note:
Standpipes
> 50 mm (2")

Process Cautions:

Keep out of path of falling material.
Consider material surface configuration when installing unit.
Protect probe from falling material.
Avoid areas where material buildup occurs.
Page EN-6
Pointek CLS100 – QUICK START MANUAL
Angle
> 50 mm (2")
Horizontal
Wall Restriction
> 50 mm
(2")
> 50 mm (2")
A5E32146158

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pointek cls100

Tabla de contenido