VERSION 12/2020
OPERATING MANUAL
6.8
COMMISSIONING
NOTICE
Impurities in the spraying system!
Spray gun blockage.
Flush the spray gun and paint supply with a suitable flushing agent before
commissioning.
6.8.1 PROCEDURE
1. Connect the product hose to the spray gun and product supply system.
2. Connect air hose to spray gun and to oil-free, dry air supply.
3. Fit air cap over nozzle.
4. Fit the air cap nut and tighten by hand.
Visually check the permissible pressures for all the system components.
5. Make sure that the device and all other conductive parts within the work area are
grounded.
6. To perform a tightness check on the entire installation, the product pressure is slowly
increased in increments using a suitable medium until the maximum pressure indicated
on the type plate is reached.
Note:
Set the operating pressure to 8 bar; 0.8 MPa; 116 psi.
Pull the trigger and check whether the spray gun closes cleanly upon release.
7. Relieve the pressure from the spray gun and device.
6.8.2 VERIFYING A SAFE OPERATIONAL CONDITION
A skilled person must check to ensure that the device is in a reliable state after it is
assembled and commissioned.
This includes:
– Carry out safety checks in accordance with Chapter 8.2.3.
DOC2422648
PILOT GM 1030P
22