WARNINGS
Boiler installation must take place in compliance
with local regulations, including those with refer-
ence to national and European standards.
• The boiler must only be used for its intended
use. Any other use is considered improper and
dangerous.
• The boiler was designed to heat water. Any
other use of liquids other than water is consid-
ered improper and dangerous.
• The boiler was designed exclusively for instal-
lation inside suitable technical premises. There-
fore it cannot be installed and work outside.
Installation outside can cause malfunctions and
danger.
• IT IS FORBIDDEN for children or people
incapable of looking after themselves to use the
boiler.
• IT IS FORBIDDEN to change or alter the
safety devices on the boiler.
• Do NOT leave packaging within reach of chil-
dren or people incapable of looking after them-
selves.
• Do NOT touch the boiler if your feet are wet or
damp.
• Do NOT plug or reduce the air vents in the
boiler technical premises.
• Do NOT plug or reduce the air vents into the
boiler.
• During operation, some elements of the boiler
can reach high temperatures, therefore avoid
coming in contact with them without having
adequate protection.
• During operation, the door of the fi rebox
MUST remain closed.
• The boiler was designed to work in any climat-
ic condition, but in the event of adverse climatic
conditions the safety systems may activate.
Under no circumstances disable the safety
devices.
• In the event of natural disasters, such as
earthquakes, fl oods, etc. immediately switch off
the boiler.
• In the event the boiler blocks, which was not
caused by normal maintenance, call the support
centre.
• The smoke vent and water drainage con-
nections must be carried out by qualifi ed
people who can issue documentation in
compliance with installation according to
national standards.
INSTALLATION
• In Italy, you need to refer to the Declaration
of Conformity in compliance with M.D. 37/2008
(previously L. 46/90) and according to the
standards UNI 10683 and UNI 10412-2.
In the event of installation in apartment blocks,
ask the administrator's opinion beforehand.
• The installation technician will illustrate func-
tioning of the system.
First start-up (testing) must be carried out by
the EDILKAMIN AUTHORISED TECHNICAL
SUPPORT CENTRE (TSC) as stated in the
standard UNI 10683.
This standard indicates the control operations
to follow on site to ensure the system is working
properly.
BOILER PREMISES
Before installing it, you can identify the point
suitable for boiler positioning, checking that:
• The boiler to install is suitable for the type of
system to insert it on.
• The premises has the requirements and char-
acteristics to meet standards in force.
• There is suffi cient combustion air fl owing in
the premises for regular combustion.
• Passage of tubing is possible for the heating
system.
• The support surface has a suitable capacity to
support the weight of the appliance. Otherwise,
the support surface should be adequately modi-
fi ed before installation.
• The rear and side walls and the support fl oor-
ing of the boiler should be created using fi re-
proof materials or covered in protective mate-
rial.
• You can easily create or position the chimney
fl ue and the external air intake.
- 50
-