How to Assemble Your Ceiling Fan (continued)
6. Reinstall the hanger ball on the downrod as follows.
Route the two 80 in. wires and safety cable through the
hanger ball. Position the pin through the two holes in the
downrod and align the hanger ball so the pin is captured
in the groove in the top of the hanger ball. Pull the hanger
ball up tight against the pin. Securely tighten the set screw
in the hanger ball. A loose set screw could create fan
wobble. (Figure 6)
7. Cut off excess lead wire approximately 6 to 9 inches
above top of the top of the downrod. Strip insulation off
1/2 inch from the end of each lead wire. (Figure 7)
NOTE: All set screws must be checked, and retightened
where necessary, before installation.
8
Figure 6
Figure 7