DISHWASHER PREPARATION (continued)
Junction Box
DOOR PANEL INSTALLATION
8
Junction
Box Cover
Figure 12
D
Figure 13
Figure 14
Removing the Toe Panel
Regular Toe Panel
The toe panel is loosely attached with tape. Remove
the tape and pull the toe panel away from the
dishwasher. Set the toe panel aside. It will be
reinstalled later.
Installing the 90° Elbow Fitting
NOTE: The 90° elbow fitting is not supplied with the
dishwasher, and must be purchased separately. If
the dishwasher's hot water supply line is to be
copper tubing, make certain the elbow has a
compression fitting.
Apply Teflon tape or other pipe sealant when
required.
Orient the hot water supply connection leg of the
elbow toward the channel opening in the dishwasher
base.
Junction Box Preparation
1. Remove junction box cover, Figure 12, by lifting
the junction box cover up and off.
2. Remove the strain relief plate by removing the
screw at the back of the junction box, as shown in
Figure 13, letter D and sliding the strain relief plate
out.
3. Set the junction box cover, strain relief plate, and
screw aside. They will be re-installed later.
GI 240-760 and GI 230-760 - Panel Installation
These models come with additional mounting hard-
ware and a template sheet that will show you how to
mount the panel. One side of the template shows
how to mount a one piece panel; the other side
shows how to mount a two piece panel. Decide
which type of installation you want before proceeding
with the installation. See Figure 14.
Figure 14
GI 240-760
Dimension
Max height of 30 7/16"
E
(774mm)
23 3/16" - 23 3/8"
F
(589mm - 594mm)
GI 230-760
Max height of 28 1/2"
(724mm)
23 3/16" - 23 3/8"
(589mm - 594mm)