RK Rose+Krieger Multilift II Instrucciones De Montaje página 35

Ocultar thumbs Ver también para Multilift II:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

The manufacturer or the person authorised are obliged to hand over the special documents for the par-
tially completed machine to the national authorities on reasoned request. This transfer is carried out in ag-
reement, in electronic or paper format.
The commercial protective rights remain unaffected by this!
Important note! The partially completed machine must only be put into operation once, if required, it has
been determined that the machine in which the partially completed machine is to be installed complies
with the regulations of this guideline.
Minden / 12.09.2014
Location / Date
Minden / 12.09.2014
Location/Date
Technical
Signature
2014
Signature
1. Declaration of Incorporation
Technical Director
Signatory's position
Managing Director
Signatory's position
35

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Multilift ii telescope

Tabla de contenido