Service; Troubleshooting And Repair - SMA SUNNY TRIPOWER STORAGE 60 Instrucciones De Instalación Y Reglaje

Ocultar thumbs Ver también para SUNNY TRIPOWER STORAGE 60:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

SMA Solar Technology AG

4 Service

4.1 Troubleshooting and Repair

The information is organized in tables showing messages
appearing in the LCS tool, known as events. The tables
contain descriptions of events as well as explanations of
which actions to take when an event occurs.
A list with battery events can be viewed on request at the
battery manufacturer.
Event type
ID
Display
Description
Measure
DNO
SMA Service Line
DC
Grid-Related Events
ID
Status
message
1–6
7–9
10–15
16–18
19, 22
28–30
31–33
Installation Manual
Indicates whether the event is of the grid, DC, internal or fail safe category.
The specific event ID.
Text shown in display.
Description of the event.
Description of which action to take prior to contacting any other parties.
If the prescribed action has not identified the malfunction, contact the DNO for further assistance.
If the prescribed action has not identified the malfunction, contact Service for further assistance
(see Section 6 "Contact", page 46).
If the prescribed action has not identified the malfunction, contact the battery manufacturer for
further assistance.
Description
Grid voltage too low.
Grid voltage average too high
for ten minutes.
Grid voltage too high.
The inverter has detected a
voltage peak on the grid.
Grid frequency too low or too
high.
Grid frequency change
exceeded.
DC current share in utility grid
is too high.
Measure
Check voltage and AC installation.
If the voltage is zero, check the
fuses.
Check that the installation is correct
in accordance with the installation
manual. If so, request a new grid
code file with increased voltage
limit or reactive power for voltage
suppression.
Check voltage and AC installation.
Check voltage and AC installation.
Check power frequency.
Check deviation of the grid
frequency.
For repeated daily occurrences,
perform onsite grid analysis.
4  Service
DNO
SMA
DC
Service
Line
x
-
x
-
x
-
x
-
x
-
x
-
-
x
STPS60-IA-xx-12
-
-
-
-
-
-
-
33

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Stps60-10

Tabla de contenido