INSTALLATION MEASURES
To carry out a proper installation of the operator parts as well as to ensure the best automation performance, the measurement levels
shown in the following table shall be complied with. Change the gate structure to adapt it to one of the cases in the table, if necessary.
m
WARNING: In the case of leaf longer than 2,5 metres, an electric lock must be fitted to ensure an efficent closig.
m
WARNING: In order to avoid contatcts of the operator against the shutter, it is necessary to keep as much exactly as
possible the height D taking into consideration a margin between 0 and +5mm.
INWARD OPENING
γ
A [mm] B [mm] C [mm] D [mm] E [mm] Lf [mm]
20
120
30
130
40
140
50
150
60
160
70
170
90°
80
170
90
180
100
190
110
190
120
200
130
210
120
100
570
100
120
100
570
100
120
110
570
100
120
110
570
100
120
110
570
100
120
110
570
100
120
120
570
120
120
570
120
120
570
120
120
570
110
120
570
110
130
565
γ
A [mm] B [mm] C [mm] D [mm] E [mm] Lf [mm]
20
30
40
50
110°
60
70
80
90
90
90
90
20
80
30
120°
80
40
80
50
20
110
150
100
550
120
150
100
550
130
150
100
550
130
150
110
550
130
150
110
550
140
150
120
550
150
150
120
550
160
150
120
550
100
160
110
535
110
160
110
535
110
165
110
535
120
165
120
535
90
90
90
80
70
70
70
70
80
80
70
70