Setting The Shielding Gas - Abicor Binzel PP Plus 36D Instructivo De Servicio

Ocultar thumbs Ver también para PP Plus 36D:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PP Plus 36D/401D
A
Yellow
B
White
C
Brown
D
Purple
E
Yellow
F
Grey
G
Brown
Tab. 7
Pin assignments

4.7 Setting the shielding gas

The control lead is open on the machine side. The customer has to provide the
connection of a suitable plug. If all data are provided, the machine can also
be delivered ready-to-connect. Otherwise choose a compatible plug for your
power supply and solder it to the corresponding leads according to the
connection diagram.
NOTE
• The type and quantity of the shielding gas depends on the welding task
and the gas nozzle geometry.
• Make all shielding gas connections gas-tight.
• To prevent the shielding gas supply from becoming clogged by
impurities, the cylinder valve must be opened briefly, before connecting
the cylinder. This will blow out any impurities that may be present.
4 Putting into operation
H
Purple
I
White
K
Green
L
Blue
M
Brown
N
White
EN - 11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pp plus 240dPp plus 401d

Tabla de contenido