Connect The Control Line; Setting The Shielding Gas Quantity - Abicor Binzel ABIROB A Serie Instructivo De Servicio

Antorcha de soldadura
Ocultar thumbs Ver también para ABIROB A Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

®
ABIROB
A

6.4 Connect the control line

2
3
1
2
4
NC
NO
a = green, b = white, c = brown, d = yellow (insulated), e = grey (insulated), f = blue (insulated),
g = pink (insulated), h = black, i = purple, j = red (insulated)
Fig. 6
Connect the control line

6.5 Setting the shielding gas quantity

Check once again whether the wire guide has been fastened correctly.
1 Join the central plug (5) and the central socket at the wire feed unit and
secure them with a connection nut (6) .
2 Fasten the air-blast hose (4) to the air-blast and spraying unit or the air-blast
valve. Seal the connection gastight if the "Cleaning with compressed air"
option is not used.
 Fig. 5 Equipping the hose assembly on page EN-10
The control line (3) is open on the machine side. The customer has to provide
the connection of a suitable plug. If all data are provided, the machine can also
be delivered ready-to-connect. Otherwise choose a compatible plug for your
power supply and solder it to the corresponding wires according to the
assignment plan.
R 1,2k
D1
3
1
2
1
C
NOTE
• The type and quantity of the shielding gas quantity depends on the
welding task and the gas nozzle geometry.
• To prevent the shielding gas supply from becoming clogged by
impurities, the cylinder valve must be opened briefly, before connecting
the cylinder. This will blow out any impurities that may be present.
6 Putting into operation
a
1
b
2
3
c
d
e
f
g
h
i
j
a
b
c
d
e
f
g
h
i
j
EN - 11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Abirob a360Abirob a500

Tabla de contenido