Connecting The Pp Plus Control Lead - Abicor Binzel PP Plus 36D Instructivo De Servicio

Ocultar thumbs Ver también para PP Plus 36D:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4 Putting into operation

4.6 Connecting the PP Plus control lead

Torch side
_
Pull
Motor
+
Trigger
1
Potentio-
3 2
meter
1
Version KZ-0 / WZ-0
Fig. 6
Connecting the control lead
EN - 10
NOTE
• Check the minimum coolant level of the cooling unit.
• Make sure that the coolant supply and return have been installed
properly. Coolant supply = blue, Coolant return = red.
• Do not use any deionized or demineralized water as coolant or for
tightness or flow tests.
This may impair the service life of your welding torch.
• For liquid-cooled PP Plus welding torches, we recommend using the
ABICOR BINZEL coolant of the BTC series.
• Each time the device is commissioned or after each cable assembly
change, the cooling system must be purged of any air: Disconnect the
coolant return hose from the re-circulating cooling unit and hold it over a
collecting device. Close opening at the coolant return. Open it again by
repeatedly and abruptly releasing it, until the coolant is flowing
continuously and without air bubbles.
Control lead 7-wired
A
E
M
B
F
G
C
D
H
I
K
L
2
Version KZ-2 / WZ-2
PP Plus 36D/401D
Machine side
1
Open
2
Open
G
M
H
N
Central plug

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pp plus 240dPp plus 401d

Tabla de contenido