Internal Battery Connection - Tripp-Lite SmartOnline SVT Serie Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Installation and Setup

3.3 Internal Battery Connection

DANGER! LETHAL HIGH VOLTAGE HAZARD!
Potentially lethal high voltage exists within the batteries, even when not connected to a UPS system. Battery
connection should be performed by qualified service personnel only, following all the precautions listed in this
manual and adhering to local electrical codes.
Internal battery connection is required for all models prior to installation. The red wire for each battery string must be connected prior to
installation, as shown below.
Internal Battery Connection Procedure
1) Remove all screws labeled #1; loosen all screws labeled #2 (Figure 3-1).
2) Remove top plate and side plate (Figure 3-2).
1
1
1
1
1
1
2
Figure 3-1
3) The BAT(+) red wires are disconnected and the terminals are covered with
insulation tape. Remove the tape and reconnect the BAT(+) wires.
SVT10KX
4) Replace top and side panels.
5) Replace and tighten all screws from Step 1 with a torque of 1Nm.
1
1
1
1
1
1
1
2
2
Figure 3-3: Location of red terminals
SVT20KX
8
Figure 3-2
SVT30KX

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido