To Check The Drain Piping; Commissioning; To Perform A Test Run - Daikin FWE03D Serie Manual De Instalación

Unidades fan coil
Ocultar thumbs Ver también para FWE03D Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
5.5.2

To check the drain piping

After the drain piping work is finished, check if drainage flows
smoothly.
1 Add approximately 1 liter of water gradually through the air
outlet.
a
a
Plastic watering bottle
b
Drain socket
a
b
c
d
a
Air outlet
b
Portable pump
c
Bucket
d
Drain socket
2 Check the drainage flow and confirm the drain operation looking
at the drain socket.
6

Commissioning

Please provide the eco design data according to (EU)2016/2281 to
the customer. This data can be found in the installer reference guide
or via the Daikin website.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
FWE03~11D
Fan coil units
3P443944-5E – 2019.09
6.1

To perform a test run

After installation, the installer is obliged to verify correct operation. In
case something is wrong with the unit and it does not operate,
contact your local dealer.
NOTICE
Do not interrupt the test run.
NOTICE
Do NOT try to dismantle the system yourself: dismantling
of the system, treatment of the refrigerant, oil and other
parts MUST comply with applicable legislation. Units
MUST be treated at a specialised treatment facility for
reuse, recycling and recovery.
WARNING
Provide adequate measures to prevent that the unit can be
used as a shelter by small animals. Small animals that
b
make contact with electrical parts can cause malfunctions,
smoke or fire.
Use proper tool for removing the screws. The product can be
disassembled as shown below.
4
24
20
1
23
3
25
18
2
26
27
16
17
19
FWE-D Recycle instruction list
Materials
Electrical part (fan motor +
capacitor)
Aluminium (fin) + copper (tube) +
galvanized steel (plate) + brass
Plastic
Plastic + metal
Plastic (frame) + plastic (net)
Galvanized steel
Galvanized steel + plastic foam
Plastic foam
6 Commissioning
9
8
22
6
5
12
10
21
14
13
15
11
7
Item
1
10
2, 18, 8, 22, 27
3, 17, 24
4
5, 9, 13, 14, 16, 20, 23, 25, 26
6, 7, 11, 12, 15, 19
21
Installation manual
13

Publicidad

Tabla de contenido
loading

Tabla de contenido