Complete Installation - Maytag MDE28PD Instrucciones De Instalación

Secadora he comercial eléctrica
Ocultar thumbs Ver también para MDE28PD:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Check the electrical requirements. Be sure that you have
the correct electrical supply and the recommended earthing
method. See "Electrical Requirements."
2. Check that all parts are now installed. If there is an extra part,
go back through the steps.
3. Check that you have all of your tools.
4. Dispose of/recycle all packaging materials.
WARNING
Electric Shock Hazard
This dryer must be earthed.
Securely tighten all electrical connections.
Failure to do so can result in death, fire, or
electric shock.
5. Switch on power supply.

COMPLETE INSTALLATION

6. Check dryer operation. Using a full heat cycle, let the dryer
run for at least five minutes. Dryer will stop when time is
used up.
NOTE: Dryer door must be closed for dryer to operate.
When door is open, dryer stops, but timer continues to run.
To restart dryer, close door and press cycle keypad.
15

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mde28pnMle27pnMle27pdMdg28pdMdg28pn

Tabla de contenido