Ikegami IPD-Q38 Manual De Instrucciones página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S1: Make a hole of about 196mm diameter (192mm~ 199mm) for camera fitting on a ceiling or
where you want to install the PTZ camera.
S2: Connect cables to the terminal block referring to the indications.
S3: Put a safety cable (short and long) on the fitting metal part with supplied screws. And after
securing protection cables on the camera side, fix the other side of the cables somewhere
secured position of the back of the ceiling.
S4: Connect the Ethernet to LAN cable. And also connect the connector A to the terminal block.
In this step, please refer to the previous pages for the name of each part and the system
connection.
S5: Insert the fitting metal into the hole on a ceiling and turn screws B(x3).
The stopper C extends and hold the position the back side of ceiling.
(Fitting range : Within a thickness of 5mm to 50mm)
Repeat the same procedure again, if you can see the stopper C from the hole K.
S6: Fix the safety cable to the hook on the upper side the camera and insert the camera so that
the markers of the camera and the fitting metal becomes correspond.
Please pay attention not to pinch the wires.
When it goes to the end and turn clockwise (direction of arrow mark) until it stops. And
secure it with fixing screw D.
Be sure that the camera is in the right position, otherwise the risk of un-secured screw
may happen. It may cause a risk of drop of the camera.
S7: Set the metal part E of the ornamental ring with the cut-out of the holder and turn the unit
clockwise. And secure it.
Be sure to secure the fixing screw. Also check if the dome cover is in a secured
position and fixed.
E-11

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido