INSTALLATION
Remove cable retention clip.
12
EATON 9130 (9910-E15/E16) UPS Installation Guide for IBM
6.
Verify that the EBM connections are tight and that adequate bend
radius and strain relief exist for each cable.
7.
Continue to "Starting the UPS" on page 22.
Plug in EBM cable. Rotate clip.
Figure 3. Connecting the EBMs
Reinstall cable retention clip.
S
®
Applications
164201783 Rev 2