OPERATION

Configuring the UPS for EBMs

24
EATON 9130 (9910-E15/E16) UPS Installation Guide for IBM
To ensure maximum battery runtime, configure the UPS for the correct
number of EBMs:
1.
Press any button on the front panel display to activate the menu
options, then select SETTINGS, USER SETTINGS, and NUMBER OF
BATTERY STRINGS.
2.
Use the
or buttons to select the number of battery strings
according to your UPS configuration:
All UPS and EBM Cabinets
UPS only (internal batteries)
UPS + 1 EBM
UPS + 2 EBMs
UPS + 3 EBMs
UPS + 4 EBMs
NOTE If 0 is selected, no batteries are connected and all battery-related
alarms are disabled.
NOTE The UPS contains one battery string; each EBM contains two battery
strings.
3.
Press the
button to save the setting.
ESC
4.
Press the
button until the start screen appears.
Number of Battery Strings
1 (default)
S
®
Applications
164201783 Rev 2
3
5
7
9