ABB Powernet EIB 6972 AG-102-500 Instrucciones De Uso página 45

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82
Installation
Connection
• Unless you have done this already before, lay the connecting lines now
- for the connected electrical consumers or shutter motors
- for the pushbutton inputs
When using actuator outputs for a shutter control, the pushbuttons for the
(optional) local operation must be designed as shutter pushbuttons.
ATTENTION
Observe the national standards and regulations governing polyphase operation:
- if the voltage for contact interrogation is provided externally by another phase
- if the voltage supply of the actuator outputs is effected via several different
phases.
• Before connecting the connecting line(s) to a screw/plug-in terminal, remove
the damp-proof cable gland from the housing and slide it over the ends of the
connecting line(s).
• Strip off approx. 7 mm of the insulation from the connecting line(s) and fix the
bare cable ends in the provided contacts of the screw/plug-in terminal by
screwing.
ATTENTION
Thereby, observe the location and orientation of the pin names at the push-
on terminal strips!
• Position the damp-proof housing cover at an appropriate distance from the
screw/plug-in terminal and push terminal and cable gland into the provided
recesses at the same time. Ensure that no kinks are formed in the connecting
lines.
ATTENTION
The screw/plug-in terminal must snap into place perceptibly in order to
make a reliable connection. Ensure that the screw/plug-in terminals are in
a straight position in the lower part!
GB

Publicidad

Tabla de contenido
loading

Tabla de contenido