Mounting And Installation; Preparing The Mounting And Installation - Vaillant VWZ MPS 40 Manual Del Usaurio

Ocultar thumbs Ver también para VWZ MPS 40:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

MOUNTING AND INSTALLATION

4
Mounting and installation
i
Notes
All the drawings dimensions are shown in mm.
4.1
Preparing the mounting and
installation
4.1.1
Delivery and installation on site
4.1.1.1
[product] unpack
► Remove the product from its box.
► Remove the protective fi lm from all parts of the product.
4.1.1.2
Check scope of delivery
► Please check the scope of delivery for completeness.
► 1 Hydraulic module + 3 plug 1" + 1 plug 1"1/4
► 1 accessories bag
► 1 bag of documents (1 operating and installation)
4.1.2
Observing distances and mounting
clearances
4.1.2.1
Product and connection dimensions
3 6
0
20
4.1.2.2
► Make sure that no item that can easily catch fi re is in
direct contact with the components, which may reach a
temperature greater than 80°C.
► Make sure that there is a minimum distance of 200 mm
between items that can easily catch fi re and the hot
surfaces.
4.1.2.3
► Ensure the distances indicated on the diagram.
This will ensure that the connections to the water can be
accessed and inspected.
Additional clearances around the appliance may be
advantageous for its installation and maintenance.
0
3 5
i
180
87
212
Distance to infl ammable parts
Mounting clearances
200
200
mini.
mini.
Notes
* Clearance necessary for the installation or
maintenance of the appliance.
0020153953_05 - 03/15 - Vaillant
180
101
220
>600*
180

Publicidad

Tabla de contenido
loading

Tabla de contenido