Lag Bolts
5. Install the Carrier
IMPORTANT! It may be difficult to drill pilot holes for the feet lag
bolts if your carrier has been adjusted to a low height. If there is not
enough room to drill the pilot holes, mark their location and
temporarily remove the carrier to drill them.
Mark the hole locations for the eight lag bolts, one for each foot
and three on either side of the carrier.
Drill pilot holes (remove the carrier if needed) for the lag bolts.
NOTE: If the carrier is installed onto a concrete subfloor use
concrete expansion bolts (not supplied) when securing the feet of
the carrier.
Secure the carrier to the support studs using minimum 3/8'' x
2-1/2'' (64 mm) long lag bolts and washers (not supplied), one at
each location.
1247365-2-B
10