Machine Installation; Uncrating Machine; Filling Ballast Tank; Machine Setup - Tennant 5200 Manual De Operación Y De Piezas

Ocultar thumbs Ver también para 5200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MACHINE INSTALLATION

UNCRATING MACHINE

Carefully check carton for signs of damage. Report
damages at once to carrier. Check carton contents to
ensure all accessories are included.
To uncrate your machine, remove straps and raise
brush head. To raise brush head, step down firmly on
the bottom brush lift foot pedal until pedal locks into
the raised position. Carefully lift or create a ramp using
crate boards to remove machine from pallet.
ATTENTION: Do not roll machine off pallet,
damage may occur.

FILLING BALLAST TANK

After removing machine from shipping pallet, hinge
over the recovery tank and fill ballast tank with clean
water. Replace plug securely after filling (Figure 1).
(Models sold in Canada require recovery tank lock
bracket removal to access ballast tank).
FIG. 1

MACHINE SETUP

ATTACHING SQUEEGEE

1. Pull back on squeegee lift lever to raise squeegee
mount bracket.
2. Loosen two thumb knobs on squeegee and slide
squeegee into slot at rear of squeegee mount
bracket. Make sure that squeegee roller wheels
are facing toward the rear (Figure 2).
Tennant 5200 Electric (11–01)
Home Find... Go To..
FIG. 2
3. Tighten thumb knobs securely.

INSTALLING BRUSH OR PAD DRIVER

1. Turn machine off.
FOR SAFETY: Before leaving or servicing
machine, stop on level surface and turn off
machine.
2. Lower brush head. Step down firmly on top pedal
and push pedal forward to lower (Figure 3).
FIG. 3
3. Position squeegee swivel mechanism so it's
centered behind machine.
4. Tilt machine back to access motor hub.
5. Select a recommended pad or brush that best
meets your cleaning needs.
NOTE: Consult your authorized distributor for pad and
brush recommendations.
OPERATION
5

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

609601

Tabla de contenido