Descargar Imprimir esta página

ProMinent DULCOTEST CLB1-mA-10ppm Instrucciones De Montaje Y Funcionamiento página 41

Publicidad

Idiomas disponibles

Idiomas disponibles

Electrical installation
1.
Turn the sensor adapter a quarter run in
an anticlockwise direction and remove
(bayonet fitting)
2.
Loosen the clamping screw on the con‐
nection and pass through the measuring
line from the control device
Fig. 3: 2-lead connection
3.
Strip the ends of the cables and connect
to the 2-lead connection: 1 = plus, 2 =
minus
4.
Bring approx. 5 cm of the measuring
wire into the sensor and tighten the
clamping screw on the connection
5.
Push the sensor adapter fully into the
housing and turn it carefully in a clock‐
wise direction until it can go no further,
ensuring that the nibs of the bayonet
fixing do not break off
A0102
Installation
41

Publicidad

loading