Pneumatic Installation - Festo DGC-HD Instrucciones De Utilizacion

Ocultar thumbs Ver también para DGC-HD:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
DGC-HD
5.2

Pneumatic installation

For installation in a vertical or inclined position:
Warning
Injury to people and material damage!
If there is a pressure failure, the work mass will
slide down.
• Check whether HGL non-return valves are
required. In this way, you can prevent the work
mass from sliding down suddenly.
• Check whether safety measures are required to
prevent slow sinking as a result of leakage
(e.g. toothed latches, moving bolts or
emergency buffers).
• Select the suitable compressed air supply ports.
In addition to the supply ports provided at the factory (W), there are also the alternative ports (A).
These are fitted with plug screws.
A(2)
A(2)
1
W =
Supply ports from the plant
1 =
End position cover side
1
=
Movement to the cover side
Fig. 9
For setting the speed:
• Rotate the one-way flow control valves GRLA into the supply ports.
24
Fig. 8
1
2
W(1)
2
W(2)
A
=
Alternative ports
2 =
End position, connection side
2
=
Movement to the connection side
Festo – DGC-HD – 1304NH English
A(1)
A(2)

Publicidad

Tabla de contenido
loading

Tabla de contenido