Sime RMG MK.II Serie Manual De Instalación página 50

Ocultar thumbs Ver también para RMG MK.II Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ler.gas.conversion.kit,.pressure.regulator.
(3...20. mbar). with. pressure.
(4...37. mbar). and. apply. the. LPG. adaptor.
code.6248303.onto.the.gas.valve.(5.fig..10).
for."70÷100 Mk.II" models..
To.adjust.the.operating.pressures,.refer.
to.section.4.2..
When the working pressures have been 
adjusted, reseal the regulators.
After. have. ultimated. the. conversion. of.
the. boiler,. please. stick. onto. the. casing.
panel. the. plate. showing. the. relevant.
feeding. gas. which. is. included. into. the.
conversion.kit.
NOTE: After assembling all the gas con-
nections,  a  test  for  gas  tightness  must 
be carried out using soapy water or spe-
cial products. Do not use naked flames. 
The conversion to different gas must be 
carried  out  exclusively  by  authorized 
technical personnel.
4.5 
SHELL DISASSEMBLY (fig. 12)
Follow. the. steps. described. below. to.
disassemble.the.shell.(fig..12):
–. Remove. the. shell. door. (1). which. is.
attached.with.pressure.fit.pins.
50
–. To.remove.the.cover.(3).loosen.the.two.
regulator.
screws. that. attach. it. to. the. flue. gas.
chamber.and.lift.
–. Remove.the.top.front.panel.(2).placing.
it.against.the.flue.gas.chamber.
–. Disassemble. the. left. side. (4).
unscrewing. the. nuts. that. attach. it. to.
the.tie.rods.
–. Do.the.same.operation.to.disassemble.
the.right.side.(5).
–. Remove.the.inner.wall.(6).by.pulling.it.
forward.
–. Unscrew.the.nuts.that.secure.the.rear.
wall.(7).to.remove.it.from.the.tie.rods.
4.6 
CLEANING AND 
MAINTENANCE (fig. 13)
At. the. end. of. each. heating. season,. it. is.
essential. to. have. the. boiler. thoroughly.
checked.and.cleaned.out.
Proceed.as.follows:
–. Turn.the.main.switch.off.to.stop.elec-
tric. power. reaching. the. boiler. and.
close.the.gas.feed.cock.
–. Remove.the.shell.door.and.cover.
–. Remove. the. top. panel. of. the. flue. gas.
chamber.attached.to.it.with.self-thre-
ading.screws.
–. Remove.the.gas.unit.
–. Insert. a. special. brush. from. the. top.
into. the. rows. of. pins. in. the. cast. iron.
exchanger.and.move.the.brush.up.and.
down.to.remove.the.scales.
–. Remove. the. burner. from. the. nozzle.
header. and. aim. a. jet. of. air. toward.
the. inside. of. the. burners. to. remove.
any.dust..Make.sure.that.there.are.no.
scales. on. the. top. drilled. part. of. the.
burners.(fig..13).
–. Remove.any.scales.from.the.bottom.of.
the. boiler. and. replace. the. items. that.
were. removed,. checking. the. position.
of.the.gaskets.
–. Check.the.chimney.to.make.sure.that.
the.flue.is.clean.
–. Check.operation.of.the.equipment.and.
the.main.burner.
–. After. assembly. of. all. the. gas. con-
nections,. these. must. be. tested. for.
soundness,. using. soapy. water. or.
appropriate. products.. DO. NOT. USE.
NAKED.FLAMES..
Preventive  maintenance  and  checking 
of  efficient  operation  of  equipment 
and  safety  devices  must  be  carried  out 
exclusively by authorized technical per-
sonnel.
Fig..12

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido