Installation And Commissioning; Commissioning Check List; Dryer Auxiliary Connections - Parker CDAS Serie Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 255

3 Installation and Commissioning

Only competent personnel trained, qualified, and approved by Parker domnick hunter should perform installation,
commissioning, service and repair procedures.

3.1 Commissioning Check List

Positioning
Ensure adequate space for installation / maintenance
Piping Installation
Electrical Installation
Power connections
Ancillary connections
Remote alarm connection
Remote Stop / Start
Purge economy
Check / Setup control box
ECO Set point
o
o
Temperature units
C or
F
Check / change inlet valve configuration
Normally Closed (standard)
Normally Open (option)
Dipswitch change when changing inlet valve configuration from N/C to N/O
please note setting up dryer for N/O configuration may affect warranty
Pressurisation / Leak check
Purge setting
Set purge for minimum inlet pressure
Operation
Dryer start-up procedure
Monitor operation / performance
Troubleshooting (if required)
Installation and Commissioning Complete
Task
Page
Section
15
3.3.2 Space Requirements
15
3.4.1 General Requirements
17
3.5.1 Dryer Supply
17

3.5.2 Dryer Auxiliary Connections

18
3.5.3 Remote Alarm Connection
18
3.5.4 Remote Start / Stop
19
3.5.5 Purge Economy
19
3.5.8 ECO Digital Input
17
3.5.2 Dryer Auxiliary Connections
17
3.5.2 Dryer Auxiliary Connections
17
3.5.2 Dryer Auxiliary Connections
17
3.5.2 Dryer Auxiliary Connections
16
3.4.4 Purge Settings
16
3.4.4 Purge Settings
20
3.6 First Time Start-Up
21/22/23
4 Operating the Dryer
28
6 Troubleshooting
Tick when OK
13

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ofas serieCdashl50-40g16ae

Tabla de contenido