Blackmagic Design HyperDeck Extreme 8K HDR Manual De Instalación Y Funcionamiento página 65

Ocultar thumbs Ver también para HyperDeck Extreme 8K HDR:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 355
Preparing the HyperDeck Extreme 8K HDR or
HyperDeck Extreme Control for individual rack installation:
1
Position the blanking panel on one of the sides of your HyperDeck unit, depending on
whether you would like the unit to sit on the right or left of the shelf. The front face of
the blanking panel should be parallel with the front panel of the unit.
2
Attach the blanking panel to the side of your HyperDeck unit using three of the
supplied blanking panel screws.
3
Use three of the rack ear screws to attach a rack ear to the other side of the
HyperDeck unit.
With the rack ear and blanking panel now attached, you can install the HyperDeck unit into a
rack. Use the mounting holes on both sides and standard rack screws.
Preparing to rack mount a HyperDeck Extreme 8K HDR
with a HyperDeck Extreme Control.
When rack mounting HyperDeck Extreme 8K HDR and HyperDeck Extreme Control side by
side, it's best to have the controller on the right. This way your headphone port will be on the
far left and your search dial on the far right, making it a seamless transition from traditional
broadcast deck to your HyperDeck Extreme.
1
The two units will be joined on one side using support brackets, so the first step is to
remove the two rubber feet from the joining side of each unit.
2
The units will be secured via the cable brackets on the rear along with t shaped
support brackets installed on the base.
Accessories
65

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hyperdeck extreme control

Tabla de contenido