Connect Ductwork; Connect Electrical - GE Profile PV970 Serie Manual Del Propietario E Instrucciones De Instalación

Campanas de ventilación de chimenea
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION—VENTED TO THE OUTSIDE
5

CONNECT DUCTWORK

• Remove shipping tape from the damper.
• Install ductwork, making connections
in the direction of airflow as illustrated.
• Push duct over the exhaust outlet and damper.
• Secure joints in ductwork with sheet metal screws.
• Wrap all duct joints and the flange connections
with aluminized duct tape for an airtight seal.
Airflow
Duct tape
over seam
and screw
CAUTION:
Do not use sheet metal
screws at the hood flange connection. Doing so will
prevent proper damper operation. Seal connection
with tape only.
Installation Instructions
Screw
16
6

CONNECT ELECTRICAL

Verify that power is turned off at the source.
WARNING:
with a ground wire, a ground must be provided
by the installer. When house wiring is aluminum,
be sure to use U.L. approved anti-oxidant compound
and aluminum-to-copper connectors.
• Remove the 6 screws on the junction box cover
and the knockout on the top left side.
Knockout
Junction
box cover
• Secure the house wiring to the junction box with
a strain relief (not provided).
• Connect the white lead to the branch circuit white lead.
• Connect the black lead to the branch circuit black lead.
• Connect the green/yellow lead to the branch
circuit green lead or bare ground lead.
• Secure all the connections with wire nuts on each
electrical connector.
• Push the wires into the junction box and replace
the cover. Be sure the wires are not pinched.
• Secure the junction box cover with the 6 original
screws.
If house wiring is not 2-wire

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Profile pv976 serie

Tabla de contenido